They started by removing marble wall panels from the driveway walls that lead down to the parking garage under the temple.
The whole driveway needs to be redone because it is cracking so they are removing the layers bit by bit fom the anti-slip layer, through cement and heated tubing and insulating layers down to the gravel.
The dirt and insulation and lining also has to be removed completely so that the flowerbeds can be waterproofed again to stop the leaking that has been such a problem.
These two parts of the renovation are more extensive than Henk or I had imagined.
The last part of the renovation project will be replacing most of the carpet inside the temple. The original carpet from 18 years ago will finally be replaced. All chairs and furniture have to be removed and many of them will be recovered with new fabric. Some of the wooden items will be refinished or replaced.
We look forward to the end result when the temple reopens at the end of October.